Our 100% project success track record in biosolids management is due to our progressive project design-delivery approach.

It begins with a clear understanding of each municipality’s needs and priorities, which is why input about your operation is invaluable. After you complete and submit the following information, we will send you a report that will help you determine possible next steps in lowering the costs and risks of reaching your operation’s goals.

Your Name (required)

Your Email (required)

Phone

Title

Agency / Organization

Address

City

State

Country

Does your facility require capital investment for capacity, odor control, or regulatory compliance?
 Yes No

Do your facilities utilize aerobic digestion?
 Yes No

Do your facilities own or operate lime stabilization equipment?
 Yes No

Do your facilities own or operate sludge dewatering equipment?
 Yes No

What class of biosolids does your current facility produce?
 Class A Class B

What class of biosolids does organization want to produce?
 Class A Class B

Issues or Management Considerations

REGULATORY
Ability to comply completely with current and future regulations related to biosolids and other emissions
Likelihood of Occurrence (1=lowest to 5=highest)  1 2 3 4 5
Severity of Consequence (1=lowest to 5=highest)  1 2 3 4 5

Must resolve regulatory issue(s) within the following timeframe:

What criteria must be met to consider the regulatory issue(s) resolved?

ODORS
Degree to which current and planned operations are subject to odor production and generation of negative sentiment from employees, neighbors or public media
Likelihood of Occurrence (1=lowest to 5=highest)  1 2 3 4 5
Severity of Consequence (1=lowest to 5=highest)  1 2 3 4 5

Must resolve odor issue(s) within the following timeframe:

What criteria must be met to consider the odor issue(s) resolved?

ENVIRONMENTAL SITE ISSUES
Degree to which the system impacts the surrounding community with respect to odor, visual detraction, noise)
Likelihood of Occurrence (1=lowest to 5=highest)  1 2 3 4 5
Severity of Consequence (1=lowest to 5=highest)  1 2 3 4 5

Must resolve environmental site issue(s) within the following timeframe:

What criteria must be met to consider the environmental site issue(s) resolved?

SAFETY CONCERNS
Ability of the system to limit exposure to potential hazards and direct exposure to sludge and safety record of current facility
Likelihood of Occurrence (1=lowest to 5=highest)  1 2 3 4 5
Severity of Consequence (1=lowest to 5=highest)  1 2 3 4 5

Must resolve safety concerns / issue(s) within the following timeframe:

What criteria must be met to consider the safety concerns / issue(s) resolved?

AGING INFRASTRUCTURE
Degree to which current infrastructure is suffering due to end of life or under-performance, including needed replacements and upgrades
Likelihood of Occurrence (1=lowest to 5=highest)  1 2 3 4 5
Severity of Consequence (1=lowest to 5=highest)  1 2 3 4 5

Must resolve aging infrastructure issue(s) within the following timeframe:

What criteria must be met to consider the aging infrastructure issue(s) resolved?

OPERATIONAL COMPLEXITY/SIMPLICITY
Ease of operation and maintenance related to process automation, minimal operational and maintenance training, land
application, seasonal constraints, R&M

Likelihood of Occurrence (1=lowest to 5=highest)  1 2 3 4 5
Severity of Consequence (1=lowest to 5=highest)  1 2 3 4 5

Must resolve operational complexity/simplicity issue(s) within the following timeframe:

What criteria must be met to consider the operational complexity/simplicity issue(s) resolved?

FUTURE COST UNCERTAINTY
Degree to which current and planned operations may be subject to cost fluctuations due to repairs, maintenance, operation, CIP escalation

Likelihood of Occurrence (1=lowest to 5=highest)  1 2 3 4 5
Severity of Consequence (1=lowest to 5=highest)  1 2 3 4 5

Must resolve future cost uncertainty issue(s) within the following timeframe:

What criteria must be met to consider the future cost uncertainty issue(s) resolved?

CAPACITY CONSTRAINTS
Degree to which current and planned operations are reaching critical mass or design capacity due to growing population, consolidation, etc.

Likelihood of Occurrence (1=lowest to 5=highest)  1 2 3 4 5
Severity of Consequence (1=lowest to 5=highest)  1 2 3 4 5

Must resolve capacity constraints issue(s) within the following timeframe:

What criteria must be met to consider the future capacity constraints issue(s) resolved?

URBAN ENCROACHMENT
Degree to which new stakeholders are locating in proximity to plant, such as new neighborhoods, close schools, etc.

Likelihood of Occurrence (1=lowest to 5=highest)  1 2 3 4 5
Severity of Consequence (1=lowest to 5=highest)  1 2 3 4 5

Must resolve urban encroachment issue(s) within the following timeframe:

What criteria must be met to consider the urban encroachment issue(s) resolved?

END PRODUCT marketability
Biosolids end product quality provides a variety of disposition or beneficial reuse options, including sale as a value-added product and material disposal (uncertain disposal costs)
Likelihood of Occurrence (1=lowest to 5=highest)  1 2 3 4 5
Severity of Consequence (1=lowest to 5=highest)  1 2 3 4 5

Must resolve end product marketability issue(s) within the following timeframe:

What criteria must be met to consider the end product marketability issue(s) resolved?

Additional Comments